Skip to main content

AVF Partners

Guide15 October 20267 min read

Co-packer minimum order quantity: how to get a small test run

Quoted thousands of units when you only want a test run? Here is what drives co-packer minimums and how to ask for a smaller first run.

AVF PartnersUpdated 15 Oct 2026
A worker filling food trays on a conveyor belt in a food factory
  • Minimums come from fixed setup, cleaning, ingredient and packaging costs, not from the factory being difficult.
  • Ask for a pilot batch, a shared run, tolling or your own packaging, and offer a plan of several small runs.
  • Compare the full cost per unit delivered, including freight and storage, not just the factory price.

Yes, many co-packers will make a small first run for a food founder, but you have to pick a factory whose equipment suits small batches and ask for it directly. The best routes are a pilot batch, a shared run, simple stock packaging and a clear volume plan. Expect to pay more per unit.

Many founders get quoted thousands of units when all they want is enough stock to test a few shops or markets. The co-packer minimum order quantity (MOQ, the smallest run a factory will make) comes from real setup costs. So the way to get a smaller first run is to pick a factory whose equipment suits small batches, ask for a pilot or shared run, and keep your first pack simple. Here is how each step works. We start with Australia, but the same steps work in other markets.

Why is a co-packer minimum order quantity so high?

Minimums are high because every run has fixed costs, and the factory has to cover them whether you order 500 units or 5,000. A US co-packer’s guide to MOQs names setup time, labour, getting the equipment ready and cleanup as the work behind every run.

A guide to negotiating MOQs with co-packers gives a simple example. Say a factory needs at least 4 hours of run time to cover changeover and cleaning, and your product runs at 1,000 units per hour. Then it needs an order of at least 4,000 units before that run pays.

The main things that push minimums up are:

  • Line setup and cleaning. Changeover, cleaning and warm-up cost the same however small the run. Complex recipes, allergens or ingredients that leave hard-to-clean residue need more cleaning, so the minimum goes up.
  • Ingredient minimums. The factory has its own minimum orders with its ingredient suppliers.
  • Equipment and capacity. The machines, floor space, staff and production schedule all set the smallest volume a site can run efficiently.
  • Automation. Automated filling and packing lines need high volumes to pay for themselves, so they usually have higher minimums than manual or small-batch lines.
  • Packaging. Bottles, jars, pouches and labels can carry their own minimums, and these are sometimes bigger than the factory’s run. Our first-run MOQ guide explains why.

Your pack format matters too. Some factories will accept a smaller run if you use stock packaging, such as a standard bottle, jar or pouch with your own printed label.

What small-run options can you ask a co-packer for?

Ask directly for a pilot run, a shared run or a tolling deal. Factories that take small runs can be harder to find than high-volume ones, so it pays to ask. MOQ guides suggest these options:

Bottles being filled on an automated production line
Automated lines need high volumes to pay off, which can raise minimums. Photo by Mina Rad on Unsplash.
  • Pilot or test batch. A small run that checks the recipe, packaging, yield and process before you commit to the full MOQ. Some co-packers ask for one before production anyway.
  • Shared run. Your order uses the setup for a similar product the factory is already making for another brand, so your share of the changeover cost is lower.
  • Tolling. You supply the raw materials yourself. This can help when the factory’s real problem is its own ingredient minimums.
  • Your own packaging. Ask whether you can supply the packaging yourself, which changes what the factory has to buy.
  • A plan of small runs. Offer something like 3 small runs over 12 months, and be flexible on timing so the factory can fit you into quieter slots.

Expect to pay more per unit for a small run. For a launch, a small premium can be worth it, because you test the market without being stuck with a large amount of unsold stock.

In Australia, a government food pilot plant is another possible first step. The Queensland food pilot plant at Coopers Plains is a scaled-down factory where businesses can make trial product under industrial conditions. It is run jointly by the Department of Primary Industries and CSIRO. Prices depend on the project, and they give you an indicative price when you apply.

Is a small run cheaper locally or made overseas?

It depends on the product and the volume, so compare the full cost per unit delivered, not the factory price alone. Co-Packing Express suggests comparing setup, materials, storage, freight, testing and payment terms, not just the headline minimum. If you import, freight, duties and customs clearance are added to the bill, and on a small order those costs are shared across fewer units.

Your total cost can include processing, packaging materials, warehouse handling, storage and labelling. A bigger run lowers the processing cost per unit, but it also means more stock to pay for and store. Work out both before you commit.

Two things help on an overseas run. Putting several products in one shipment spreads the freight across more cartons. It also matters who books the freight and who carries the risk, and our guide to EXW, FOB and DDP for food importers explains how each option changes your landed cost (the full cost to get stock to your door). This is general information only. For duties, permits and biosecurity rules on your product, check the official source or ask a licensed customs broker.

What should you ask in a quote request for a small run?

Give the factory enough detail to price your real first run, and ask the questions that bring hidden costs into the open.

  1. Describe the product, where your recipe is up to, and the pack format and size. Lock in the fill weight first, because it decides how many units a batch makes.
  2. Share a realistic first order plus a 12-month volume plan, with your sales channels and when you expect to reorder.
  3. Ask whether the MOQ is counted in units, litres or kilograms, and how setup fees and packaging materials are charged.
  4. Ask for prices at two or three volumes, so you can see where the cost per unit drops.
  5. Ask about production tolerance (how far the final quantity can be over or under the order). Contracts often allow about plus or minus 10 percent, so check how it affects your invoice and your stock.
  6. Ask whether a pilot batch is required, and whether you can supply your own packaging.

Then add the cost of holding stock: warehouse fees, products that expire before they sell, insurance, and cash sitting in stock. A lower unit price on a bigger run can disappear once you count months of storage. If you are a first-time founder, our page for food creators and founders is a good place to start. For our current minimum runs, contact us for a quote.

What to do next

Make a short list of co-packers whose equipment suits small batches, and send them all the same brief so you can compare quotes fairly. Our first-run guide to minimum order quantities covers ways to test demand before you commit. If you are starting from a family recipe, read how to commercialise a hot sauce recipe. If you are thinking about a first run made in Vietnam, you can start a project and talk it through with the AVF team.

Written 15 October 2026.

Questions about this topic

Can I do a small test run with a co-packer?

Yes, many co-packers will make a small first run, especially those with manual or small-batch lines. Ask directly for a pilot batch or a shared run, and expect a higher price per unit than on a full production run.

Why do co-packers set minimum order quantities?

Every production run has fixed costs such as line setup, changeover, cleaning, equipment warm-up and the factory’s own ingredient minimums. The minimum spreads those costs over enough units to make the run pay for the factory.

How can I lower a co-packer’s minimum order quantity?

Offer a volume plan over 12 months, be flexible on timing, and ask about pilot batches, shared runs, tolling or supplying your own packaging. Stock packaging with your own printed label can also make a smaller first run easier.

Should I pay more per unit for a smaller first run?

Often yes, if it lets you test the market without holding a lot of stock. Compare the higher unit price against the cost of storing extra stock, the risk of it expiring and the cash tied up in it.

Sources

  1. Co-Packing Minimum Order Quantity: What MOQs Mean for Your Brand (Co-Packing Express, 2026-07-29)
  2. Negotiating MOQs with Co-Packers: A Brand Owner’s Practical Guide (Guidance, 2026-04-16)
  3. Food pilot plant (Business Queensland, Queensland Government, 2025-07-23)

Cover photo by Holzke Menü Essen auf Rädern on Unsplash.

Ready to make your product in Vietnam?

Tell us what you want to make. We reply within 1 business day.